Primary Backup Servers - DC1 Replication Servers - DC2
PC Backups Offsite Backups Unatended Backups Free Software PC Backups Offsite Backups Unatended Backups Free Software PC Backups Offsite Backups Unatended Backups Free Software PC Backups Offsite Backups Unatended Backups Free Software
Specs PC-Backups Data Center 1 Specs PC-Backups Data Center 2
   
Municipal Power
Vendor: CenterPoint
Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers
Service level: Critical Customer - similar to Hospital Service level
Vendor: CenterPoint
Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers
Service level: Critical Customer - similar to Hospital Service level
   
Backup Generators
Generator 1
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 1250 Kw
Deployment: Load Sharing

Generator 2
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 1500 Kw
Deployment: Load Sharing

Generator 3
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 2000 Kw
Generator 1
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 2000 Kw
Deployment: Load Sharing

Generator 2
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 2000 Kw
Deployment: Load Sharing

Generator 3
Power Plant: 16 Cylinder 3000 horse power
Cummins Marine Grade Diesel
Gen Set: ONAN Wattage: 2000 Kw
   
Deployment: Load Sharing
All three Generators share the load at DC1 with the help of paralleling gear. When a service outage occurs all three generators will start for 10 minutes. If the total load is less then 60% of capacity of one generator, then the other generators will shutdown automatically. If the load reaches 80% of capacity of one generator the other generators will restart
The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly.
   
Power Switching
In the event of a service outage from CenterPoint, the generators will turn over and power will be switched automatically in seconds. This system is tested every month.
   
UPS
5 - 375 Kw Mitsubishi 4 - 375 and 4 - 500 KVA Mitsubishi
   
Cooling Units
AC Units: Data Aire 30 Ton
Number of Units: 30
Total tonnage: 900 Tons
AC Units: liebert 30 Ton
Number of Units: 34
Total tonnage: 1020 Tons