| Primary Backup Servers - DC1 | Replication Servers - DC2 | ||
|
|
||
| Specs PC-Backups Data Center 1 | Specs PC-Backups Data Center 2 | ||
| Municipal Power | |||
| Vendor: CenterPoint Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers Service level: Critical Customer - similar to Hospital Service level |
Vendor: CenterPoint Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers Service level: Critical Customer - similar to Hospital Service level |
||
| Backup Generators | |||
| Generator 1 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 1250 Kw Deployment: Load Sharing Generator 2 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 1500 Kw Deployment: Load Sharing Generator 3 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw |
Generator 1 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw Deployment: Load Sharing Generator 2 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw Deployment: Load Sharing Generator 3 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw |
||
| Deployment: Load Sharing | |||
| All three Generators share the load at DC1 with the help of paralleling gear. When a service outage occurs all three generators will start for 10 minutes. If the total load is less then 60% of capacity of one generator, then the other generators will shutdown automatically. If the load reaches 80% of capacity of one generator the other generators will restart | |||
| The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly. | |||
| Power Switching | |||
| In the event of a service outage from CenterPoint, the generators will turn over and power will be switched automatically in seconds. This system is tested every month. | |||
| UPS | |||
| 5 - 375 Kw Mitsubishi | 4 - 375 and 4 - 500 KVA Mitsubishi | ||
| Cooling Units | |||
| AC Units: Data Aire 30 Ton Number of Units: 30 Total tonnage: 900 Tons |
AC Units: liebert 30 Ton Number of Units: 34 Total tonnage: 1020 Tons |
||